Quick afternoon out at the park. Got all set up and was working some QSO’s and could hear something moving through the undergrowth. Final I saw what was making the noise. A herd of longhorn cattle!

Glad I had the fence between me and them.

| Operation Details |
| Park: https://pota.app/#/park/GB-0021 Grid square: IO93lt WAB square: SE63 |
| Working Conditions |
| Icom IC-7300 Icom IC-705 Spider beam 7m pole Sotabeams Band Hopper III |
| Operation Totals |
| 17 QSOs 9 DXCC Entities 5 P2P 4 Bands and 1 mode 40m – 9 SSB 20m – 8 SSB |
